Scope of Work
Provide 30 day electrical load test
Provide 800 amp stainless steel disconnect
Provide 800 amp breaker
Provide electrical duct bank for electrical feeders 4 x 3” conduits
Saw cut and demo 80 LF of concrete for duct bank
Incase duct bank and repair concrete road way back to existing conditions.
Land conduit in existing switchgear
Provide lock out tag out plan
C&G engineering (electrical design)