top of page
8(a) Government Contractor
Scope of Work
Install 8 traffic rated Electrical Vaults.
Install 20 new street light poles and
Install 2000 LF electrical conduit bank incased in concrete.
Install 5000 LF of electrical wire.
Traffic control and Phasing
All excavations, trenching and boring.
Asphalt Repair 1700 LF.
Provide Temporary Lighting
C&G Engineering (Electrical Design & DOR)
SDSE Structural Engineering
Project Gallery
bottom of page