NSWC Corona Telecommunications Rooms Upgrade and CAT6 Cabling

Install and upgrade infrastructure in TRs of specified buildings.

N6426723P0282

Contract Number -

$1,550,000.00

Award Amount

Sep 20, 2023

Award Date

Sep 21, 2024

CCD

Scope of Work:

General Scope:

  • Provide labor, material, and equipment for TR upgrades and CAT6 cabling.

  • Design for each TR includes cabinet placement, backboards, ladder rack, power location, grounding busbar as required.

Specific Tasks for All Buildings:

  1. Installations:

    • Install cabinet and backboard in TR.

    • Install 30A circuit in TR with a quad outlet in the cabinet.

    • Install ladder rack and UPS in cabinet.

    • Bond and ground ladder rack and cabinet.

    • Install j-hook pathway, cable tray distribution pathway (if space available), surface mount raceway, and surface mount back boxes.

    • Install CAT6 patch panels, horizontal cable managers in cabinet, and CAT6 cabling.

    • Test and label CAT6 cabling.

    • Install JCI switch.

    • Demo out CAT5e cabling after CAT6 installation (NMCI cabling remains).

    • Remove patch panels, patch cords, and equipment from the old rack.

  2. CAT6 Cabling Drops:

    • Bldg 204: 72x2 drops (one VOIP, one RDTE).

    • Bldg 501: 48x3 drops (one VOIP, two RDTE).

    • Bldg 502: 96x3 drops (one VOIP, two RDTE).

    • Bldg 503: 48x3 drops (one VOIP, two RDTE).

    • Bldg 504: 48x3 drops (one VOIP, two RDTE); Un-terminate CAT5e and reuse.

    • Bldg 508: 96x4 drops (one VOIP, one NMCI, two RDTE).

    • Bldg 510: 96x3 drops (one VOIP, two RDTE).

    • Bldg 511: 48x3 drops (one VOIP, two RDTE).

    • Bldg 512: 72x3 drops (one VOIP, two RDTE).

    • Bldg 513: 72x3 drops (one VOIP, two RDTE).

    • Bldg 516: 96x3 drops (one VOIP, two RDTE); Install power poles as required.

    • Bldg 517: 96x4 drops (one VOIP, one NMCI, two RDTE).

    • Bldg 518: 96x3 drops (one VOIP, two RDTE); Un-terminate CAT5e and reuse.

    • Bldg 519: 96x4 drops (one VOIP, one NMCI, two RDTE); Install power poles as required.

    • Bldg 520: 96x3 drops (one VOIP, two RDTE); Install power poles as required.

    • Bldg 521: 96x3 drops (one VOIP, two RDTE).

    • Bldg 523: 96x3 drops (one VOIP, two RDTE).

    • Bldg 539: 24x3 drops (one VOIP, two RDTE).

  3. Additional Specific Tasks:

    • Bldg 216: Install UPS in the existing cabinet.

    • Bldg 514: Install JCI switch.